How many cubic meters of land are included in a Kamaz

Dimensions and volume of the body of various KamAZ models

Mechanical engineers produce several modifications of special equipment with distinctive characteristics, the main ones are listed in the table.

Parameters of various models of special equipment

BrandLoad capacity, t.volume, m3Length, mmWidth, mmHeight, mm
43255/536057/7,26/6,56090/665025002920/2935
5511106,6410025001200
652213,412780025003280
65111148,27400250031350

To make the right choice when ordering special equipment, it is not enough to know the dimensions of the body, as well as the amount of cargo being transported. It is also necessary to take into account the correspondence between cubic capacity and mass, which are individual in each specific case.

Overall dimensions and volume of KamAZ trucks of various models

Let's look at the technical characteristics of the devices, including the volume of the KamAZ dump truck in cubes.

Overall dimensions of KamAZ dump truck two-axle KamAZ 43255 and 53605:

  • Load capacity 7 tons (7.2 tons, on a road surface allowing an axial load of 130 kN up to 11,000 kg).
  • the length of the KamAZ dump truck is 6090 for KamAZ 43255 (6650 for KamAZ 53605) mm,
  • width of KamAZ dump truck - 2500 mm,
  • the height of the KamAZ dump truck from the ground is 2920 (2935) mm, the base is 3500 (3950) mm.

The volume of the body platform is 6 (6.5) m 3, respectively.

The dimensions of the KamAZ 5511 Dump Truck are presented in the table:

The capacity of the KamAZ dump truck in m 3 of model 5511 is 6.6 m 3

Triaxial units - 6x4, including: 65115, 6520-19, 6520-60, 6520-61 and 689011.

Capacity - from 10 to 20.9 m3

Dimensions vary depending on the model:

  • KamAZ dump truck body length - from 6690 to 9900 mm;
  • width of the KamAZ dump truck - 2500 mm;
  • the height of the KamAZ dump truck is from 2955 to 3055 mm, the base is from 3190+1320.

Three-axle all-wheel drive 6522, a device that is used if road conditions are extremely difficult. Its load capacity is 13400 kg.

What is the volume of the KamAZ dump truck body? - 12 m 3

All-wheel drive vehicle 65111 is a device with increased cross-country ability. Its load capacity is 14,000 kg. So, KamAZ dump truck body volume table, it also includes data on the dimensions of special equipment.

How many cubes are in the back of a KamAZ dump truck 65111? - 8.2 m3

Rules for calculating the weight and volume of various materials

The bodies of special equipment indicate the weight and capacity of KamAZ that can be transported. With loads that have a constant mass (equipment, machinery, etc.), everything is very clear. When it comes to bulk materials, it can sometimes be difficult to determine their true mass. This is due to the degree of humidity and density. In this case, it is the bulk density that is taken into account (i.e., without compaction).

Having made the necessary calculations, it is easier to select a car of the required cubic capacity with the maximum permissible tonnage. Knowledge of these parameters allows you to use dump trucks more profitably and not drive them underloaded.

How much sand can fit?

Before you begin calculating the cubic capacity of sand that needs to be transported, it is recommended to look at the material’s passport, where its bulk density is indicated. Typically it is 1.6 tons per 1 m3, with wetter sand the density will be 1.8 t/m3.

If you plan to take a KamAZ with a carrying capacity of 7, 2, 10 or 14 tons, then it will be possible to transport in it:

  • 7.2/1.6 = 4.5 m3 or 7.2/1.8 = 4 m3 (permissible - 6.5 m3);
  • 10/1.6 = 6.25 or 10/1.8 = 5.56 (6.6);
  • 14/1.6 = 8.75 or 14/1.8 = 7.78 (8.2).

The higher the density of the material, the fewer cubes of sand will fit in the dump truck body. In the last example, it can be seen that KamAZ 65111 is not suitable for transporting sand with a density of 1.6 with a maximum load of 14 tons due to a mismatch of parameters.

When filling the full volume with sand, it is not always possible to guess the weight, and then you end up with an overload. In this case, the calculations are carried out as follows:

  • 6.5 x 1.6 = 10.4 tons. 6.5 x 1.8 = 11.7 tons (with a load capacity of 7.2 tons);
  • 6.6 x 1.6 = 10.56 6.6 x 1.8 = 11.88 (at 10);
  • 8.2 x 1.6 = 13.12 8.2 x 1.8 = 14.76 (at 14).

From the calculations it is clear that not every body can be loaded with sand as much as possible in order to maintain the standard load capacity.

How many cubic meters of sand are in KamAZ?

In order to calculate how many cubic meters of sand are in a KamAZ dump truck, you need to know the load capacity of the device, the capacity of the body, and the humidity of the bulk material. This knowledge is necessary for customers to be confident that contractors are delivering sand in full. You also need to take into account the bulk density of sand, it is equal to 1.6 tons per m3. For example, if the weight of sand is 9.6 tons, then only 6 cubic meters of products will fit in the body. The volume of the KamAZ dump truck body in cubes, taking into account sand, will be equal to 9.6 tons / 1.6 tons = m3. If the density of the sand is much denser, for example, 1.8 tons per m3, then only 5.% m3 of sand will fit into the back of a 10-ton dump truck. The sand density value can be found in the document, which the driver must have.

Be sure to take into account the load-carrying capacity of the structure; the device can have a capacity of 6 m3, 8 m3, 10 m3, 12 m3, 20 and 25 m3.

Examples of calculations for models:

  • 6 m3 of sand, the density of which is 1600 kg/m3 (on average), weighs 1600 x 6 = 9600 kg or 9.6 tons.
  • 8 m3 of sand, the density of which is 1600 kg/m3, weighs 1600 x 8 = 12800 kg or 12.8 tons.
  • 10 m3—1600 x 10=16000 kg or 16 tons.
  • 12 m3—1600 x 12=19200 kg or 19.2 tons.
  • 20 m3 of sand – 1600 x 20 = 32000 kg or 32 tons.
  • 25 m3 of sand – 1600 x 25 = 40000 kg or 40 tons.

The density of sand does not have an exact indicator, since it varies and depends on the presence of impurities and the degree of humidity.

How many cubes of crushed stone can fit in a KamAZ truck?

How many cubes of crushed stone in a KamAZ dump truck - calculation features.

  1. A vehicle with a carrying capacity of 15 tons will deliver:
      Crushed stone with a density of 1300 kg/m3 is only 10 m3, this is due to the limitations of the body size: 15 tons / 1300 kg/m3 = 11.5 m3.
  2. Crushed granite 10 m3, this is due to restrictions on the size of the body: 15 tons / 1470 kg/m3 = 10.2 m3.
  3. If crushed stone has a high bulk density, then its moisture content will increase, which will lead to the fact that a smaller volume of material can be transported. How many tons of crushed stone is in a KamAZ dump truck with high moisture? 8-9 m3.

  4. The device, with a lifting capacity of 7.7 tons and a platform volume of 6 m3, will deliver:
      Limestone crushed stone, the density of which is 1300 kg/m3, is about 6 m3: 7.7 tons / 1300 kg/m3 = 5.9 m3.
  5. Granite crushed stone with a density of 1470 kg/m3 is only about 5 m3: 7.7 tons / 1470 kg/m3 = 5.2 m3.
  6. A vehicle with a carrying capacity of 25 tons and a platform volume of 20 m3 will deliver:
      Crushed stone with a density of 1300 kg/m3 about 19 m3: 25 tons / 1300 kg/m3 = 19.2 m3.
  7. Crushed stone, the filling of which is 1470 kg/m3, is only 17 m3: 25 tons / 1470 kg/m3 = 17 m3.

The calculation of how much crushed stone is in a KamAZ dump truck is carried out necessarily taking into account the capacity of the body, the load capacity of the device, as well as the bulk density of crushed stone.

  • 6 m3 x 1470 kg/m3 = 8.82 tons, a truck with a body size of 6 m3 will deliver 7.7 tons.
  • 8 m3 x 1470 kg/m3 = 11.76 tons, only for 8 or 10 m3 vehicles.
  • 10 m3 x 1470 kg/m3 = 14.7 tons, for a body of 10 m3.
  • 12 m3 x 1470 kg/m3 = 17.6 tons, body milking 12 m3.

How many cubic meters of land are there in a KamAZ dump truck?

The calculation of how many cubic meters of earth are in a KamAZ dump truck also depends on the carrying capacity of the special equipment, its capacity and the volume of the black soil itself. The machine places 7 to 8 m3 of earth or black soil in its body. Please note: soil, soil and black soil have the same density. How many cubic meters of soil are there in a KamAZ dump truck if the soil is piled high? Another plus two cubic meters is added.

Firewood and expanded clay capacity

The cubic capacity of the KamAZ dump truck allows it to accommodate 6.5-7 cubic meters of firewood. They are most often transported to private homes, whose owners order logs for heating during the onset of cold weather. 6.5-7 cubic meters of firewood, provided that the logs are split. If they are round, then they take up more space, and only 5 cubic meters of firewood will fit in the KamAZ.

As for expanded clay, this material is stored in the form of cones.

The volume of the cone is calculated using the following formula: n x R^2 x H/3, where n is the stable value of 3.1415, R is the radius of the embankment, H is its height.

There is also another way to calculate: multiply the height, length and width of the body.

If the sides of the body are slightly sloping, then it’s worth subtracting a few cubes from the resulting result. That is, in order to calculate how many cubes of expanded clay in KamAZ, you just need to multiply the dimensions of the structure and you will get the result.

Recommendations for selection

When choosing a suitable device, you need to pay attention to the following points:

  1. The comfort of the driver's cabin, it should have air conditioning, a heating system and a convenient control panel.
  2. Technical parameters of the car. Important: among them, you need to pay attention to power, body volume, body dimensions, load capacity, ease of control and operation, and cab type.
  3. Reliable design, ease of maintenance and operation. You need to choose a model that will not break down every six months.
  4. It is also worth considering how many cubes of black soil in a KamAZ dump truck, as well as sand, expanded clay, firewood and crushed stone can be placed in the device. This is necessary, first of all, for private individuals to account for the transportation of materials, as well as for construction companies that are engaged in sending orders.
  5. Additionally, it is worth paying attention to the presence of a heated platform, seat ergonomics, turning radius and maneuverability of the device, heated mirrors and body, and vehicle stability.

How much crushed stone can fit?

The cubic capacity of transported crushed stone is calculated in a similar way. Here the quality of the material should be taken into account. Lime crushed stone has a density of 1.3 t/m3, granite - 1.47.

If you take a 10-ton vehicle, it will be able to transport less than the maximum weight of building material, since the dump truck’s capacity of 6.6 m3 will not allow:

  • 10/1.3 = 7.69 m3 of crushed limestone;
  • 10/1.47 = 6.8 crushed granite.

A fully loaded vehicle will accommodate bulk materials weighing:

  • 6.6 x 1.3 = 8.58 tons of limestone;
  • 6.6 x 1.47 = 9.7 crushed granite.

The transported quantity in this case does not exceed the maximum tonnage.

How many cubes of earth can a KamAZ truck hold?

If you plan to transport pure plastic chernozem, then its bulk capacity is 0.75 t/m3. For wet soil it is 1.1 t/m3. Having 3 options for cars, they calculate which one can accommodate the maximum allowable volume of land:

  • 7.2/0.75 = 9.6 m3. 7.2/1.1 = 6.55 m3. (with a maximum permissible load of 6.5 m3.);
  • 10/0,75 = 13,3. 10/1,1 = 9 (6,6);
  • 14/0,75 = 18,7. 14/1,1 = 12,7 (8,2).

Only in one option is there a correspondence between the load capacity and the volume. Based on the cubic capacity of the body, we obtain the following values ​​for the mass of the earth:

  • 6.5 * 0.75 = 4.88 t. 6.5 * 1.1 = 7.15 t (with a load capacity of 7.2 t);
  • 6.6 * 0.75 = 4.95. 6.6 * 1.1 = 7.26 (at 10);
  • 8.2 * 0.75 = 6.15. 8.2 * 1.1 = 9 (at 14).

These calculations make it possible to load the body of dump trucks with “heaped” earth.

How many cubic meters are in KamAZ models 6540 and 65201

Diagram and design of a KamAZ gearbox
The load capacity of the modern KamAZ - 6540 model is 18,500 kg, the volume of the dump truck body is 11 cubic meters. meters, which is equivalent to 1,100-10 liters. buckets of coal with a total weight (1,100 x 18) 19,800 kg. And "KAMAZ - 65201" is capable of taking cargo up to 25,500 kg, the volume of the dump truck body is 16 cubic meters. meters, which translates to 1,600 tons 10 liters. buckets of coal with a total weight (1,600 x 18) 28,800 kg.

Amount of m3 in KamAZ - table

MaterialKamaz-53111, m 3Kamaz-6520, cubic meters
Concrete blocks and concrete construction debris5,58
Uncompacted and compacted manure6.6 (up to 7 if with a slide)20
Bricks6,510
Fine crushed stone 0-40 mm6,613
Coarse gravel 40-70 mm6,612,5
Sand dry6,612,7
Sand is wet6,29,52
The soil is dry6,614
Fresh chernozem5,99,1
Expanded clay6,620
Firewood6,620
Asphalt crumbs6,610,5

As can be seen from the table, the new KAMAZ-6520 dump truck can take more cubic meters of light cargo, for example, the same brick, but it will not be able to carry more than 10 cubic meters of concrete or black soil, despite the size of its body. Therefore, when ordering such a dump truck, you need to be prepared for the fact that the driver will refuse to load the truck completely. Otherwise, he may simply have an accident, break his truck, receive a fine, and given the not very high quality of the “Tatar” trucks, the frame of the dump truck may simply burst. But the old Kamaz-53111 can almost always be loaded to the very top, without worrying that the vehicle will be overloaded.

How many cubes are included in KamAZ of different materials?

To calculate how many cubic meters of soil, sand, crushed stone, expanded clay or other material are in a Kamaz truck, you need to know the cubic capacity of the body. You will need it to calculate the cost of transporting any material. An important parameter when calculating the cubic capacity of sand is its humidity and density. Depending on these indicators, cubic meters will be calculated.

To calculate the required volume of crushed stone, use our online calculator.

Crushed stone and sand are the most necessary materials on a construction site and when organizing site planning, so the need for crushed stone and sand is very high, which requires the purchase of materials in machine volumes. Determining how many cubes of sand are in the machine to sufficiently support construction is a priority task.

How much firewood can it hold?

Firewood is not a bulk material, and calculations here are carried out differently. When purchasing wood, it should be taken into account that the capacity of a KamAZ truck is not the cubic capacity of the imported timber. Each case will have to be considered individually, because the type of firewood itself matters. They can be logs of various lengths, or chopped.


Table for calculating the cubic capacity of logs and timber

In one case, the firewood is neatly stored, in the other it comes in bulk. This is all reflected in the final cubic capacity of the wood.

If the woodpiles are stored, then a stacking factor of 0.7 is taken. The volume of the KamAZ body is multiplied by it:

  • 6.5 * 0.7 = 4.55 m3 of real firewood;
  • 8,2 * 0,7 = 5,74.

The situation is more complicated with bulk cargo. Here you will have to take into account the parameters indicated in the table.

Data for wood recalculation

Log length, mConversion factor
0,250,8
0,330,78
0,500,75
0,750,73

First, the storage cubic meters are calculated, then multiplied by the conversion factor.

So, if we used model 53605 (6.5 m3) to transport logs 0.33 m long, then the calculations look like this:

  • 6.5 x 0.7 = 4.55 m3 of stored firewood;
  • 4.55 x 0.78 = 3.55 m3 of real logs brought in bulk.

Having such simple knowledge of calculating capacity, you will not have to overpay for air, which intermediaries sometimes try to sell along with firewood.

Video: Full review of KamAZ 6522

Publications on the topic


Technical characteristics of KamAZ 55111 and the structure of the dump truck cab


Design and technical characteristics of the KamAZ-54115 vehicle


Technical parameters of KamAZ 55102

How many cubic meters of firewood can it hold?

Firewood is needed with the onset of cold weather, and therefore every owner of an individual house tries to order enough cubic meters of these logs to be enough for heating for the winter. Before placing an order, you need to know how many cubic meters of firewood are in a Kamaz truck in order to know whether to buy one car or two.

The amount of firewood will depend on how the logs are cut and stacked. If the logs are chopped, then the machine can hold 6.5-7 cubic meters of material.

Round wood takes up more space, so only 5 cubic meters of firewood .

You can buy firewood at a sawmill or sawmill. You will have to load it manually or using a special loader.

Rating
( 2 ratings, average 4.5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]