Monolithic foundation is the supporting part of the structure, which is responsible for the length of its operational life.
Building a house from aerated concrete requires calculating the number of blocks that are needed for the construction of the future building.
curbstone
The streets of modern cities and towns, major highways can no longer be imagined without such an important element,
How many bricks are needed for a 2m fence post? how many bricks do you need for a fence post?
With an emphasis on the upper shelves
Features of a kitchen under concrete In the 20s of the last century, the rhythm of life acquired dynamics and became
How to glue drywall with glue
Frameless installation of gypsum boards on unleveled wall bases offers a number of significant advantages.
Cement, gravel, sand and water are used to prepare concrete.
Types of concrete mixers Modern units are divided into three main types: Forced - are stationary
Production of PB grade slabs using continuous molding method
How are PB and PC slabs produced? The markings PC and PB indicate floor slabs
Glass fiber reinforced concrete - what is it? You need to know that glass fiber reinforced concrete is a composite material, in
Combination of aerated concrete with wooden materials When arranging housing, the internal space can be divided by partitions made of
For any suggestions regarding the site: [email protected]
Russian | English
Для любых предложений по сайту: dush-pol@cp9.ru