Strip foundation with a slab on the ground: is it worth doing? Builder reviews

The strip foundation is currently one of the most common. This type of foundation is relatively cheap and evenly distributes the load from the pressure of the walls. The strip foundation is universal in use because it is suitable for buildings of different construction technologies. However, the strip base is not suitable for some types of soil. In this case, preference is given to a strip foundation with a monolithic slab.

Construction of a strip foundation with a slab on the ground

Such structures combine the advantages of strip and slab foundations and can be simply represented as a flat box standing upside down.

At the first stage, a strip base is built, and a monolithic slab is poured on top of it. In this case, its edges rest on the tape. As a result, the house itself is located on a slab foundation which, in turn, stands on a strip foundation. As a result, the weight of the building is redistributed, reducing the load on the belt.

The advantages of a slab foundation are reduced to reduced pressure on the ground, due to the larger support area. Such a foundation, when the ground moves, will move along with the building without causing much harm. The strip foundation reduces the likelihood of lateral displacement and is an additional reinforcement of the perimeter of load-bearing walls.

This design makes it possible to reduce the thickness of the slab and the width of the base tape. These elements mutually reinforce each other and allow you to save on building materials.

Pros and cons of the solution

When choosing a strip base with a slab on the ground, it is worth understanding the pros and cons of such an engineering solution. The advantages include the following factors:

  • Increased strength. A reinforced concrete slab can withstand even high loads.
  • This type of base is suitable for different types of soil, including clay, peat, loam, as well as high groundwater levels.
  • Long service life of the base.
  • Such a foundation can be considered the basis for a building with any number of floors.
  • The monolithic slab will be the basis for the future floor of the first floor.

However, a strip foundation with a slab on the ground also has its downsides:

  • increased consumption of building materials compared to the construction of a conventional strip foundation;
  • due to the shallow depth of the foundation, accurate calculations are required;
  • High labor intensity of the process due to the need for excavation and concrete work;
  • High cost compared to a conventional strip base.

However, in general, expert reviews about this type of foundation are positive; the positive qualities of such foundations outweigh the disadvantages.

Soil moisture indicators established by GOST.

It is necessary to compact the soil in conditions of high humidity. That is, if the soil is dry, then it must first be moistened. The aspect that should be taken into account is that soil moisture must correspond to certain parameters established by GOST:

  • for sand – from 8% to 12%;
  • for light sandy loams – from 9% to 12%;
  • for loamy and light soils – from 12% to 17%;
  • for heavy soils – from 16% to 23%.


How to fill the foundation inside a house?
Slight waterlogging is allowed, equal to the coefficient established by the standards depending on the type of soil - from 1 to 1.35. A more accurate indicator can be established in the laboratory by conducting a series of special studies. Soil that is too dry must be moistened. Soil with high humidity must be dried.

A feature of soil moisture is the fact that water is not suitable for such activities. It is necessary to make special clay or cement milk. To do this, several handfuls of cement or clay are dissolved in water. The resulting solution should resemble a primer in structure: have the density of water, but have a white color. The foundation is backfilled after the soil has absorbed a sufficient amount of the composition.

Calculation of a strip foundation with a slab on the ground

To build a reliable strip foundation with a monolithic slab, complex engineering calculations are required. It is not recommended to carry out them yourself without proper knowledge and experience. These works should be entrusted to professional architects. When making calculations, it is necessary to take into account a number of factors:

  • Characteristics of the soil on the site, this will require testing;
  • Dimensions of the future building according to plan;
  • Analysis of the possible tilt of the structure during its operation;
  • Calculation of foundation compression;
  • Carrying out calculations according to the deformation scheme.

Only taking all this into account can the depth of the strip base, its width, and the cross-section of the monolithic slab be calculated.

Types of strip base

At the first stage of construction, a strip foundation is erected. A trench is dug under it, and a layer of sand is laid along its bottom. Waterproofing is installed on top of the pillow and only after that can you begin to arrange the base itself. Strip foundations can be of two types:

  • Monolithic, that is, made of concrete mortar;
  • Prefabricated, that is, assembled from reinforced concrete products.

The second option is not used as often, since it requires the use of special equipment. The foundation can also be divided according to the type of burial:

  • Shallow - such structures are suitable for one-story buildings or light cottages (frame, timber, foam block). The depth in this case is 0.5-0.7 meters. The soil acidity indicator is also important; it should be low or medium.
  • Recessed - this type of foundation is used for the construction of high-rise buildings or when using heavy materials, for example, in the construction of monolithic cottages. In this case, the foundation goes deep 0.2-0.3 m below the soil freezing level.

Solid foundation slab - application specifics

A monolithic slab made of reinforced concrete has an increased safety margin and is used in industrial, civil and residential construction for the construction of various types of buildings:

  • country houses;
  • private houses;
  • group and single cottages;
  • industrial facilities;
  • premises for storing vehicles;
  • various low-rise buildings.


Builders have to pour different types of foundations to build buildings.
The strength characteristics of a reinforced concrete foundation allows it to withstand the weight of buildings made of various materials:

  • block concrete;
  • natural stone;
  • baked brick;
  • wooden beam;
  • rubble stone;
  • reinforced concrete.

Slab foundations are also used as the basis for the construction of frame buildings and log houses. The foundation slab for a house made of aerated concrete has proven itself positively in various operating conditions. It prevents cracking of walls built from fragile gas-filled blocks.

A monolithic slab is the best option for solving the following problems:

  • construction of buildings on marshy soils;
  • construction of houses on soils with nearby groundwater;
  • construction of buildings on problematic soils prone to heaving;
  • construction of the facility on bulk soils containing fine sand.

Before pouring a monolithic slab, you should calculate the strength of the structure and calculate the reinforcement. When determining the possibility of using a solid slab to construct a foundation for a specific structure, you should determine the thickness of the base and select the depth of the slab base.


The weight of buildings made of various materials allows them to withstand the strength characteristics of a reinforced concrete foundation

The following factors must be taken into account:

  • soil properties at a construction site;
  • groundwater level;
  • load characteristics of the foundation;
  • the mass of the future building;
  • features of climatic conditions;
  • altitude fluctuations at the work site;
  • performance characteristics of the building material used.

The expanded range of application of the monolithic slab is due to the increased area of ​​the supporting sole, which provides:

  • proportional distribution of the mass of the structure onto the soil;
  • preventing settlement of individual parts of the building frame;
  • damping soil reaction associated with frost heaving;
  • impossibility of cracks forming on the walls of the building.

Construction methods

A strip foundation with a slab on the ground can be of two types:

  • With a ground floor;
  • Without him.

Foundations with plinth

In the first case, a monolithic slab serves as a ceiling separating the ground level and the first floor. In this case, the construction scheme looks like this:

  • The site for construction is prepared, a pit is dug on it.
  • A layer of ASG is placed on the bottom.
  • The formwork is formed and the reinforcement system is formed.
  • The concrete solution is poured.
  • The foundation is maintained for 28 days. After this period, continuous formwork is installed, supported by a cut of the strip base. For reliable fixation from below, it is supported by a wooden beam. At the same time, in the formwork it is necessary to consider passages to the ground floor and communications inputs.
  • A reinforcement system is installed, a concrete mixture is poured, which is kept until completely hardened.

This technology requires certain experience and skills. The use of ready-made reinforced concrete slabs greatly simplifies the installation of the floor. In this case, the length of the slab in a free position without support from pillars should not exceed 6 meters.

Foundation without plinth

This design involves completely filling the internal space of the strip base. A multilayer structure is formed inside:

  • The sand mixture is backfilled using a layer-by-layer tamper.
  • A double waterproofing layer is required.
  • A reinforcement system is being formed. Since the monolithic slab is supported by its entire area, structural reinforcement is used.
  • Concrete mixture is poured. During this process, it is necessary to use tamping equipment. When constructing a private house of a small area, you can use manual rammers; when constructing larger buildings, it is necessary to use deep vibrators.

The concrete is kept for 28 days until it hardens completely.

Laying a sand cushion

The backfill under the slab should be as uniform as possible; it is advisable to use river or quartz sand. It is necessary that there are no clay inclusions in the sand, which will help retain moisture inside. Either complete backfilling with sand or layer-by-layer filling with fine gravel is allowed. The presence of the latter will allow the sand layer to be compacted more strongly. Another sand layer of at least 50 mm is laid on top.

Construction of formwork structure

The formwork is assembled from wooden panels and boards. The height of the structure should exceed the level of pouring the concrete mixture by 100-150 mm. Gaps with a width of no more than 3 mm are allowed. The outer side of the formwork is strengthened with support beams and inclined stops. They will prevent the walls from being squeezed out under the influence of the poured solution. When constructing formwork for the base, it is necessary to first assemble a system of support beams and crossbars. Only after this can you begin to assemble the plane.

A thick film is laid on top of the formwork, which will seal it, preventing the concrete solution from leaking out.

Reinforcement system and grouting

A foundation reinforcement system is formed from steel rods. A mesh with a cell no larger than 200 mm is assembled from them. Two layers of grating are installed with a distance of 100-150 mm from each other. The reinforcement system should be located from the bottom plane at a height of 50 mm. To do this, the bottom layer is placed on timber stands.

The solution is poured evenly over the entire area of ​​the slab. The final layer should overlap the upper reinforcing mesh by at least 50mm. After completing the pouring procedure, the slab is covered with polyethylene to protect against moisture loss. It is also recommended to moisten the surface with water during the first few days. This is necessary to compensate for humidity differences and protects against cracking.

Installing a subfloor on a slab

There are several technologies for organizing a subfloor. Reviews from experts indicate that the most optimal is to create the following design:

  • A pillow and sifted sand are laid;
  • A “skinny” screed is poured on top;
  • A layer of insulation is laid; craftsmen prefer penoplex;
  • Another layer of screed 50-70 mm is poured;
  • A leveling screed is poured; self-leveling compounds are usually used;
  • A finishing coating is laid on top of it.

If the slab is insulated from below, you can use floating floor technology. It involves creating a “pie” from:

  • sand mixture, instead of it you can use expanded clay for additional insulation;
  • Sheet material is laid on top, it can be MDF, plywood or chipboard.
  • A finishing coating is laid on top of the subfloor.

A strip foundation with a slab can become a reliable foundation for a cottage. It is suitable for areas with different types of soil and tolerates soil movements well.

The procedure for covering large openings

If the opening is wide enough, floor slabs can only be laid on the foundation using additional elements. In order not to destroy the entire product, two methods are used. In the first case:

  • determine the amount of free space that should be filled during installation, divide it by two;
  • install the first slab, prudently departing from the edge a distance numerically equal to the obtained value;
  • install all slabs in accordance with the requirements of the regulations;
  • measure the remaining space, which should be numerically equal to the distance left earlier when installing the first slab;
  • fill the gap on both sides of the structure, laying cinder blocks with their ends facing the main surface;
  • control the position of the block holes, which should be directed to the side.

Blocks will help block free spaceSource stroyimdom.com

In terms of labor intensity, the second method is significantly superior to the first. In this case, having previously determined the amount of free space, distribute it evenly between the laid slabs. After installation is completed, the resulting gaps are sealed as follows:

  • a board is attached from below between the slabs, which can act as formwork;
  • reinforcement is placed in the space;
  • concrete solution is prepared;
  • the free space is filled with concrete mortar.